Australian Stockman's Hall of Fame

Solar for a landmark in Outback Queensland.

Longreach, QLD

A challenging outback installation on an iconic museum, with more than 350 solar panels.

Panels

Trina modules.

Installation

In Longreach.

PROJECT OVERVIEW

A cultural landmark powered by the sun.

Situated in Queensland’s Central Western town of Longreach, the installation on the museum’s stunningly constructed timber, stone and corrugated iron building offered many challenges that only an installation in Outback Queensland can dish out.

Situated in Queensland’s Central Western town of Longreach, the installation on the museum’s stunningly constructed timber, stone and corrugated iron building offered many challenges that only an installation in Outback Queensland can dish out.

Commissioned in 2016. As part of the Stockman’s Hall of Fame 5-million-dollar upgrade in 2016, stadium lighting was installed in the main arena and lighting and electronics upgraded in the main building, involving new lighting fixtures in display cabinets and retail area.

Commissioned in 2016. As part of the Stockman’s Hall of Fame 5-million-dollar upgrade in 2016, stadium lighting was installed in the main arena and lighting and electronics upgraded in the main building, involving new lighting fixtures in display cabinets and retail area.

CLIENT

Australian Stockman's Hall of Fame

COMMISSIONED

2016

01 / THE CHALLENGES

Working in extreme Outback conditions.

Working in extreme Outback conditions.

Situated in Queensland’s Central Western town of Longreach, the installation on the museum’s stunningly constructed timber, stone and corrugated iron building offered many challenges that only an installation in Outback.

Remote location

The project was delivered in Longreach, Central Western Queensland.

High temperatures

The team worked through conditions above 45°C.

Distinctive architecture

The museum uses timber, stone and corrugated iron.

THE SYSTEM AT WORK

From site to useful energy

Site assessment

Converts sunlight into clean electricity.

Tailored design

Upgraded infrastructure moves energy safely across the site.

Delivery and care

On-site generation helps reduce reliance on the grid.

02 / THE SOLUTION

Installed over four weeks.

Installed over four weeks.

With temperatures reaching over 45 degrees Celcius, the team installed more than 350 panels over four weeks. Utilising the existing steel structure located on the north of the building, high-quality Trina panels and ABB PowerOne 27.6kw inverters, the system was installed on a Sunlock mounting structure and monitored the system with ABB.

Modules

More than 350 Trina panels

Inverters

ABB PowerOne 27.6 kW

Installation

Four weeks

The system used the existing northern steel structure, Trina panels and ABB PowerOne inverters.

03 / THE RESULTS

A lasting asset for a public landmark.

A lasting asset for a public landmark.

With temperatures reaching over 45 degrees Celcius, the team installed more than 350 panels over four weeks.

Solar panels

Installed over four weeks.

Installed over four weeks.

Commissioned

Longreach museum project.

Longreach museum project.

On-site solar

The museum gained a renewable generation asset.

Remote delivery

The team completed the installation in Outback conditions.